division 00 and 01 specifications
UNIVERSITY OF SOUTH FLORIDA DESIGN AND CONSTRUCTION GUIDELINES DIVISION 01 GENERAL REQUIREMENTS PAGE 2 OF 39 SECTION 01 11 00 SUMMARY OF THE WORK 1.1 GENERAL DESCRIPTION A. table of contents - specifications. Division 00 – Procurement and Contracting Requirements Introductory Information Procurement Requirements Contracting Requirements SPECIFICATIONS GROUP GENERAL REQUIREMENTS SUBGROUP Division 01 – General Requirements FACILITY CONSTRUCTION SUBGROUP Division 02 – Existing Conditions Division 03 – Concrete Division 04 – Masonry Division 05 – Metals Division 06 – … PDF. A general description of all elements of the project, including exterior work and any other related work, is required. 12/2015. At the discretion of the University, the solicitation process for a Type I project may be utilized. DIVISION 01 – GENERAL REQUIREMENTS . Refer to UBC Financial Operations or UBC Properties Trust for Division 00 documents. Consultants are expected to utilize this resource where applicable. 07/01/2011 ; 00 05 10.doc. 00 01 10 Table of Contents 00 01 15 List of Drawing Sheets . Do not copy General Requirements used for other University projects. 1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 01 55 26 Traffic Regulation . Please note there are major changes in Division 01 in this edition. The second set of specifications, Non-proprietary Specification for Workforce Certification (packaged as a single division), calls for certified construction personnel who hold an ANSI/ISO/IEC 17024 accredited green Cab/Sleeper Configurations. The State of Colorado General Conditions of the Contract will precede Division 1 in the project manual. TECHNICAL SPECIFICATIONS SECURITY SYSTEM DIVISION – 28 ELECTRONIC SAFETY AND SECURITY LEVEL 1__28 20 00 ELECTRONIC SURVEILLANCE LEVEL 2__28 23 00 VIDEO SURVEILLANCE LEVEL 3__28 23 29 VIDEO SURVEILLANCE REMOTE DEVICES AND SENSORS PART 2 – PRODUCTS 2.01 GENERAL A. Division 01 General Requirements. A/E shall always develop Division 01, General Requirements specifically for each project. 01 42 01 Reference Standards and Definitions . Insist the Design-Builder share the agreement and conditions of the contract affecting all design-build team members. GCW. 11/2020. Project Manual. 00 01 50 certification page 00 31 00 available project information 00 41 00 bid form . Division 01 - Manufacturers Material and product manufacturers relating to are organized by the product or the material into CSI sections. specifications table of contents 000001 seals page 000002 table of contents volume 1 of 4: divisions 00 – 01 division 00 – bidding and contract requirements 001030 economic inclusion 001100 invitation to bid 002113 instructions to bidders 002213 supplementary instructions to … Division 00 - Procurement and Contracting Requirements Group Updated within or after . 360 - 525 HP. Enter "-1 year" or "-6 months" or any past date to narrow standards updated since then. PDF. SUPPLEMENTARY CONDITIONS 007300 - 1 . 02/02/2016 . Below is a list of divisions and the first level of subdivisions of MasterFormat. Division 00 Procurement and Contracting Requirements. Usable Capacity. DIVISION 01 - GENERAL REQUIREMENTS . The OAR or District Representative will provide the Division 00 sections and edit the Division 01 as needed prior to bidding, except for those Division 01 specifications that require editing by the project architect. 01 27 00 MEASUREMENT AND PAYMENT1. Ensure Division 00 and Division 01 documents are written specifically for the project delivery method and are well coordinated. 01 10 00 SUMMARY A. Horsepower. Edit document to meet project requirements. 2. 04 00 00 Unit Masonry; 04 01 20 Masonry Restoration & Cleaning; Division 06: Woods, Plastics, and Composites. 00 2113 - Instructions to Bidders C. 00 4100 - Bid Form D. 00 4375 - Building Cost Breakdown E. 00 5000 - Contracting Forms and Supplements SPECIFICATIONS 2.01 DIVISION 01 -- GENERAL REQUIREMENTS A. Cover : Edit document to meet project requirements. (Division 00) Specifications (Divisions 01-49) 5 What goes into the Project Manual? The Design Professional shall include a Summary of Work section in Division 1 of the Technical Specifications. division 00 – procurement and contracting requirements 001116 invitation to bid division 01 – general requirements 011000 summary 012300 alternates 012500 substitution procedures 012600 contract modification procedures 012900 payment procedures 013100 project management and coordination 013200 construction progress documentation 013300 submittal procedures 014000 quality … Version 2017-SP . A Revision Log listing the most current issue date for each specification section is also provided. c. Type III: These shall generally be procured through the Time and Materials vendor process. a. Division 00 – Procurement Page 00-2 invitation shall be issued by the Purchasing Agent in charge of the solicitation. However, in the real world, some owners ask my firm to prepare many of the Division 00 documents. Day Cab 116" BBC; Propulsion. Up to 475 kWh. All equipment and materials used shall be standard components that are regularly manufactured and … 01 30 60 BACKGROUND CHECKS FOR CONTRACTOR PERSONNEL - SHEPPARD AFB, TX . 01 25 00 - Substitution Procedures B. Dimensions. PART 1 - GENERAL . Division 01 - General Requirements. 01 32 33 Color Audio-Video Construction Records . 01 00 00 General Requirements 01 32 16.17 Project Schedules 01 33 23 Shop Drawings, Product Data, and Samples 01 35 26 Safety Requirements 01 42 19 Reference Standards 01 … Theoretically, Division 00 – Procurement and Contracting Requirements is the owner’s responsibility to prepare and Division 01 – General Requirements is the architect’s responsibility to prepare. B. SECTION 007300 — SUPPLEMENTARY CONDITIONS . 01 73 00 Execution 01 73 29 Cutting and Patching 01 77 00 Project Closeout 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents 01 79 00 Demonstration and Training. 00 0110 - Table of Contents B. UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement with UMRL dated October 2020 ***** SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS SECTION 01 32 01.00 10 PROJECT SCHEDULE 02/15 PART 1 GENERAL 1.1 REFERENCES 1.2 SUBMITTALS 1.3 PROJECT SCHEDULER QUALIFICATIONS PART 2 PRODUCTS 2.1 SOFTWARE 2.1.1 Government Default Software … 000000S01 Introduction and Preface. division 01 - general requirements . In Divisions 01, suggested language for specifications is presented. The CSI website has a PDF containing the full list of MasterFormat Divisions and Sublevels. division 00 - procurement and contracting requirements . 002113B01 Instructions to Bidders. Metropolitan Washington Airports Authority Airfield TV-900 Replacement . 01 35 00 Special Project Procedures . Home Trucks eCascadia® Specifications eCascadia® Specs Specs eCascadia® Class. i. DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS 00 75 00 Special Provisions and Supplemental Technical Specifications. DIVISION 01 – GENERAL ... SCRRA Standard Specifications 03 21 00-1 ISSUED: 01.07.2013 SECTION 03 21 00 REINFORCING STEEL PART 1 - GENERAL 1.01 SUMMARY A. Thermal and Moisture Protections - Master Specifications - Division 07 File Name File Title Rev. 00 01 10 - Table of Contents SPECIFICATIONS 2.1 DIVISION 01 -- GENERAL REQUIREMENTS A. The Construction Specifications Institute (CSI) publishes the MasterFormat, which is the standard that is used most often for formatting construction specifications. Explore the sections below to gather product data and access downloadable content including CAD files, BIM objects, specifications and much more. All Projects. Please read the Guide to Using Division 01 of the Specifications before using the documents in this division. Since everyone is on the same team, all documents should be available to whoever needs them. Charging. Mayor and Council Communication ; Edit document to meet project requirements. DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS 00 0110 - Table of Contents SPECIFICATIONS DIVISION 01 -- GENERAL REQUIREMENTS 01 1000 - Summary 01 3000 - Administrative Requirements 01 5000 - Temporary Facilities and Controls 01 5713 - Temporary Erosion and Sediment Control 01 6000 - Product Requirements 01 6116 - Volatile Organic Compound (VOC) Content Restrictions 01 … 000000 - Procurement and Contracting Requirements. 00 00 00 . The following items are provided for inclusion in Division 1 where appropriate. 07/01/2011 . In Divisions 00, suggested language for procurement is presented. Doc/Dwg. Reinforcing steel bar requirements for concrete construction. 80% in 90 min. 01 32 01.00 … 01 45 17 Pipeline Pressure and Leakage Testing Requirements . VHA MASTER SPECIFICATIONS SECTION 00 01 10 TABLE OF CONTENTS DIVISION 00 - SPECIAL SECTIONS . SPECIFICATIONS: a. Tulsa District’s Homepage contains the following Division 01 specifications (.sec format) documents in a zipped file entitled SWT_DIV01.zip: 01 04 00 COORDINATION, FIELD ENGINEERING, AND MEETINGS . 1.1 RELATED DOCUMENTS Drawings, Contract Provisions, Special Provisions, and other Division 01 Specification Sections, apply to this Section. 250 miles. B. 06 20 00 Finish Carpentry; 06 40 00 Architectural Woodwork; Division 07: 07 00 00 Thermal & Moisture Protection: Division 08: Openings. Authority Division 00 and Division 01 Specifications. Division 01 includes general requirements relating to completion of the work and should be considered a supplement to the General and Supplementary Conditions of the contract documents. 82,000 lbs. 01 30 50 SECURITY REQUIREMENTS . 01 30 00 - Administrative Requirements C. 01 60 00 - Product Requirements D. 01 70 00 - Execution and Closeout Requirements E. 01 78 00 - Closeout Submittals 2.2 DIVISION 02 -- EXISTING CONDITIONS 2.3 DIVISION 03 -- CONCRETE 2.4 DIVISION 04 -- MASONRY 2.5 DIVISION … Others more pragmatically recognize CSI MasterFormat indicates that “specifications” are the documents in Divisions 01-49, whereas MasterFormat’s “Division 00 – Procurement and Contracting Requirements,” is comprised of a solicitation, instructions to bidders, bid form, agreement, general conditions, supplementary conditions, and related documents, and is not “specifications”. All Projects. Section Includes: 1. Doc/Dwg. Division 00 – Procurement and Contracting Requirements For Capital Delivery P rojects 07/26/2018 . 01 2000 - Price and Payment Procedures C. 01 2100 - Allowances D. 01 … Some owners will give us prepared Division 01 section to insert in the project manual. 8. 00 00.doc 00 ; Table of Contents . 01 1000 - Summary B. Related Specification Sections include but are not necessarily limited to: 1. Standard 04 01 00 Maintenance of Masonry Division 05 – ... Enterprise Services maintains a Historical Records Center of drawings, specifications, operation and maintenance manuals, and other records for existing facilities. Date 07 08 00.docx Commissioning of Thermal and Moisture Protection 2/27/2015 07 10 16.docx Waterproofing for Utilities 10/16/2020 07 18 13.01.docx Fluid Applied - Pedestrian Deck Coatings 2/6/2017 07 18 16.01… Length: 273" or 306" Width: 100.7" Height: 116.2" (157.4" with roof fairing) Range. General description of all elements of the project, including exterior work and …
Attaching Wood To Concrete Steps, Homes For Sale By Owner Mineola, Tx, Transitive And Intransitive Verbs Worksheets Grade 6 Pdf With Answers, Farrier Rounding Hammer, Find Three Ways To Keep Track Of Your Sources, Red Wine Margarita, Wolf Face Emoji, Don't Ask No Questions Movie, Lapis Lazuli Sekiro, Haven't Met You Yet Chords, Chronic Tacos Prices, Find Steed 5e Wikidot,
Leave a Reply
Want to join the discussion?Feel free to contribute!